| CSU, Mixture and Throttle rigged, more work to do here |
| All the tail and wings are rigged |
| Autopilot readying to be installed |
| Brian doing the battery install |
| Battery install again |
| Wing tip tangs and counter weights installed |
| The day 10 build |
| The rest of the hangar |
| A troublesome door being fitted |
| The ELT install , having a fiberglass shell you dont need to install the antenna outside |
| The baffles completed |
| The gold strip is the Marker beacon antenna . Another benifit of a fiberglass strip |
| Wheel pants being installed |
| Jimbo |
| End of Day 10 |